Brick, block and stone masonry in Racine, Kenosha and Milwaukee CountyBrick, block and stone masonry in Racine
M.O.E Masonry
Round stone on the lower front of a house around a red entry door, brick or stone facade cost
Call (262) 744-4688 Request a Quote

How Much Does a Brick or Stone Facade Cost in Wisconsin?

A brick house front runs $2,000 to $13,500 for 250 to 750 square feet, says one national cost guide. A stone front in that guide runs $2,000 to $9,000 for 200 square feet of wall. A whole exterior runs $8,000 to $27,000 in brick, for 1,000 to 1,500 square feet of wall. In stone it runs $15,000 to $35,000 for 1,000 square feet.

These are market numbers, not our price list. For brick and stone facades around Racine, the price turns on the wall area and the material you pick. What has to happen before the masonry starts moves it too. The guides we read print national numbers, with no Wisconsin row.

What does the front of a house cost versus the whole exterior?

The guides price wall area, not floor area. Every figure in this table comes from one national cost guide and includes materials and labor.

ProjectBrick veneer, installedStone veneer, installed
Part of the front$2,000 to $4,500 for 250 sq ft$1,300 to $5,000 for 200 sq ft, half stone and half vinyl
Whole front$2,000 to $13,500 for 250 to 750 sq ft$2,000 to $9,000 for 200 sq ft
Whole exterior$8,000 to $27,000 for 1,000 to 1,500 sq ft$15,000 to $35,000 for 1,000 sq ft

The brick figures assume an existing foundation. The stone figures cover natural stone veneer and manufactured stone veneer. The wall areas differ, so compare materials with the per-foot figures below.

Does brick, manufactured stone or natural stone cost more?

Picking the material is a bigger question. Our post on brick veneer vs stone veneer covers weight, drainage and upkeep. It quotes other guides, so its ranges differ from these.

Here is what two guides print per square foot. Read the label on each figure, because some leave out labor.

MaterialOne national cost guideA second guide
Brick veneer$8 to $18 installed for thin brick, $12 to $18 for full-size face brickAbout $13 installed
Manufactured stone$10 to $35 installed$5 to $8, material only
Natural stone$15 to $45 installed, thin stoneUp to $44 installed, or $4.50 to $35 for material only
Labor for stone$6 to $24, labor only$3 to $15, labor only

Installed figures already count labor, so do not add the two. Keep each guide’s numbers together too. One guide’s material plus another guide’s labor is a price neither guide printed.

We lay brick veneer on new and existing fronts. Our stone veneer work covers both natural and manufactured stone.

What does a partial front cost?

Covering less wall costs less. One national cost guide puts partial brick on a house front at $8 to $18 per square foot. That comes to $2,000 to $4,500 for 250 square feet, or $4,000 to $9,000 for 500.

The same guide prices half stone and half vinyl on a 200-square-foot front at $1,300 to $5,000. A second guide calls square footage the primary cost driver, so stoning only the front costs much less. The rest of the wall stays in siding, and any new siding is another trade’s line item.

What adds to the price of a facade?

Some costs sit on top of those numbers. Here is what the guides list.

Old siding coming off. One national cost guide adds $1,000 to $9,000 on a full exterior. A second guide puts lightweight panels at $1,000 to $2,000. The first guide says vinyl has to come off before a house can be bricked. That removal is another trade’s line item, and so are windows and roof flashing.

A new ledge or footer. A Brick Industry Association technical note says brick veneer needs a noncombustible foundation to carry it. Wisconsin’s dwelling code lets veneer overhang the foundation wall by 1 inch at most (SPS 321.26).

Without that support, one national cost guide adds $15 to $30 per square foot for a new concrete brick-ledge footer. Full-bed stone sits on a ledge too. Thin and manufactured stone bond to the wall with mortar, so they skip it.

Height and scaffolding. One national cost guide says multi-level buildings need ladders and scaffolding. That raises labor costs 25 to 35 percent on average. The rise applies to labor, not the whole price.

A siding permit. The same guide puts a siding permit at $100 to $250 on average. South Milwaukee lists siding and trim work among the projects that need a building permit. Rules vary by town. The building inspector’s office answers that, and we point you there.

Matching an older house. Neither guide prices a match. Milwaukee’s Cream City brick was last made in the 1920s, says the Encyclopedia of Milwaukee. A Brick Industry Association note says to use mock-ups or sample panels when picking new brick to match old.

Can a facade grant help pay for a storefront?

Some cities help commercial owners pay for facade work. These grants are for commercial buildings, not houses. Milwaukee’s form rules out exclusively residential properties, and South Milwaukee’s guide rules out residential buildings that are not mixed use.

ProgramGrant limitShare of costCovers
Kenosha Uptown Area Facade GrantUp to $10,000, reimbursableUp to 50 percent of eligible costsStreet-facing commercial facades
South Milwaukee Facade Improvement GrantUp to $15,000, in two tiers by locationUp to a 50 percent matchCommercial districts
City of Milwaukee Facade GrantUp to $5,000, reimbursableNot more than 50 percent of eligible costsStreet-facing commercial facades

Apply and get approved before work starts. Milwaukee’s form says work started before approval is not reimbursed. South Milwaukee’s guide rules out work done before its grant agreement is signed.

Each program has its own limits, so check the rules with the city first. South Milwaukee’s commercial guidelines say unpainted brick, stone or terra cotta should not be painted or covered by another cladding. For storefront work, see our commercial masonry page.

How do you get a real number for your facade?

National ranges get you close. The real number comes from your wall: how much you cover, the material, its height and the foundation under it.

M.O.E Masonry is a masonry contractor based in Mount Pleasant on the south side of Racine. We work about 40 miles around Racine, in Racine County, Kenosha County and the south side of Milwaukee County.

We look at the job, or you send photos, and we put the quote in writing. See how we build brick and stone fronts, or call or text (262) 744-4688.

Frequently asked questions

Does brick veneer cost less than solid brick?
Yes. A separate guide page puts brick veneer at $5 to $12 per square foot, materials and installation included. Solid brick masonry runs $9 to $20 on the same page. Veneer is one layer of brick and does not hold up the house.
Can I add brick to my house?
Yes, if the foundation can carry it. A Brick Industry Association note says brick veneer needs a noncombustible foundation. One national cost guide adds $15 to $30 per square foot for a new concrete brick-ledge footer. Vinyl siding has to come off first, and that is another trade's line item.
How much does it cost to brick a 1,500 or 2,000 square foot house?
It depends on wall area, not floor area. One national cost guide prices brick veneer at $8 to $18 per square foot of wall. That works out to $12,000 to $27,000 for 1,500 square feet of wall, and $16,000 to $36,000 for 2,000. A ranch and a two-story of the same floor area have different wall areas, so measure the walls first.
Does stone veneer cost less than siding?
Usually not. One national cost guide puts stone siding at $10 to $45 per square foot, against $3 to $7 for vinyl. Fiber cement runs $6 to $13 in the same table. Stone on just the front is one way to cover less wall.
How much does stone cost per square foot?
It depends on the stone and whether labor is counted. One national cost guide puts natural thin stone at $15 to $45 installed and manufactured stone at $10 to $35. A second guide lists material alone at $4.50 to $35 for natural stone and $5 to $8 for manufactured stone. Labor is extra on those material figures.
How long do stone veneers last?
One national cost guide says manufactured stone lasts 50 to 75 years and real stone 50 to 100. A second guide says natural stone siding can reach 100 years or more. These are guide estimates. When joints wear, tuckpointing replaces the old mortar.
Is this what M.O.E Masonry charges?
No, these are market numbers from national cost guides, not our price list. Your price depends on the wall, its height, the foundation and the material you pick. We look at the job, or you send photos, and we put the quote in writing. Call or text (262) 744-4688.
Request a Quote

Get In Touch With M.O.E Masonry

Tell us about the job and where it is, and send photos if you have them. Call or text (262) 744-4688, or use the form, and we will get back to you.

  • Call or text (262) 744-4688
  • Mount Pleasant, WI · serving Racine County, Kenosha County and the south side of Milwaukee County
  • Written quotes · brick, block and stone, new work and repairs

Request a Quote

Tell us about the wall, chimney, foundation or steps and where the job is. We look at it and put the quote in writing.

Call (262) 744-4688